|
| demolished = | cost = | operator = SEQ Water | dam_type = E | dam_height = | dam_height_thalweg = | dam_height_foundation= | dam_length = 〔 | dam_width_crest = | dam_width_base = | dam_volume = | dam_elevation_crest = | dam_crosses = Tributary of South Maroochy River | spillway_count = | spillway_type = Uncontrolled | spillway_capacity = | res_name = | res_capacity_total = | res_capacity_active = | res_capacity_inactive= | res_catchment = 〔 | res_surface = | res_elevation = | res_max_depth = | res_avg_depth = | res_max_length = | res_max_width = | website = }} The Poona Dam is an eath-fill embankment dam with a toe drain with an un-gated spillway across a tributary of the South Maroochy River that is located in the South East region of Queensland, Australia. The main purpose of the dam is for storage of potable water for the Sunshine Coast region.〔 The impounded reservoir is also called Poona Dam. ==Location and features== The dam is located north-west of . The earthen dam structure is long and holds back the reservoir when at full capacity. From a catchment area of , the reservoir has a surface area of and a maximum width of . Initially managed by the Maroochy Shire Council, management of the dam was transferred to SEQ Water in July 2008 as part of a water security project in the South East Queensland region, known as the South East Queensland Water Grid. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Poona Dam」の詳細全文を読む スポンサード リンク
|